I had 25 items on my list last time. I have removed the ones I completed (you can see them in the December 2013 To Do List post) and have crossed off the ones I completed since December 4. This list is in no particular order.
To Do List:
Kelly’s Brown Round Robin- Sew on sleeve for Original Bullseye
Pillow from cake tea towelTry plain square for center of Russian Rubix blocks- Sew green and red striped 8 pointed star
- Sew white on black wavy line 8 pointed star
- Layer, baste Christmas table runner
- Quilt Christmas table runner
- Quilt/stitch fish postcard
- Wash fabric (I am guessing this will never be off the list)
- Make stiff bucket or box for TP in main bath
- Make stiff bucket or box for TP in second bath
- Dragon Box (gift)
- Anna Maria Horner Multi-tasker tote (gift-due Holiday 2013)
- Make 3 notepad covers (gifts)
Hand sew bottom opening in Shopping bag for BAMQG
To see the 26 Projects Lists, which list quilt WIPS, visit the December update