I have done nothing on this list. Bleah! Having a list is good, but it doesn’t make the work get done. I have been stitching on sleeves, which I probably should have put on the list, but didn’t. I’ll try harder for next month.
To Do List:
- Sew white on black wavy line 8 pointed star
- Layer, baste Christmas table runner
- Quilt Christmas table runner
- Quilt/stitch fish postcard
- Wash fabric AKA The Great Unwashed (I am guessing this will never be off the list, but a girl can dream) – I did wash and press another bunch of fabric. It made more of a difference than I expected and I had some fun doing it. I still have a lot to do.
- Make stiff bucket or box for TP in main bath
- Make stiff bucket or box for TP in second bath
- Dragon Box (gift)
- Anna Maria Horner Multi-tasker tote (gift-due Holiday 2013- oops)
- Make 3 notepad covers (gifts)
- Day in the Park backpack variation
- Petrillo bag #2
To see the 26 Projects Lists, which list quilt WIPS, visit the March Current Projects update. Last month’s to Do List is a little longer.
Completed items since November 4, 2013 (prior to this month’s list)
- Sew on sleeve for Original Bullseye
- Kelly’s Brown Round Robin
- Pillow from cake tea towel
- Try plain square for center of Russian Rubix blocks
- Hand sew bottom opening in Shopping bag for BAMQG
- Finish binding on T-Shirt quilt
- Secret Santa gift for BAMQG
- Kathleen’s Round Robin
- Make sleeve for Original Bullseye
- Finish sewing triangles for Scrapitude
- Take apart Ribbon Star and resew
- Color Group donation quilt
- Binding for Color Group donation quilt
- Make shopping bag for BAMQG
- Sew coffee patch to red bag
- Sew coffee patch to bathrobe
- Sew green and red striped 8 pointed star (probably should include an item called “find background template for 8 pointed star!)
- Scrap Lab backpack
- Make binding for Disappearing Pinwheel