May To Do List

I have done nothing on this list. Bleah! Having a list is good, but it doesn’t make the work get done. I have been stitching on sleeves, which I probably should have put on the list, but didn’t. I’ll try harder for next month.

To Do List:

  1. Sew white on black wavy line 8 pointed star
  2. Layer, baste Christmas table runner
  3. Quilt Christmas table runner
  4. Quilt/stitch fish postcard
  5. Wash fabric AKA The Great Unwashed (I am guessing this will never be off the list, but a girl can dream) ;-) – I did wash and press another bunch of fabric. It made more of a difference than I expected and I had some fun doing it. I still have a lot to do.
  6. Make stiff bucket or box for TP in main bath
  7. Make stiff bucket or box for TP in second bath
  8. Dragon Box (gift)
  9. Anna Maria Horner Multi-tasker tote (gift-due Holiday 2013- oops)
  10. Make 3 notepad covers (gifts)
  11. Day in the Park backpack variation
  12. Petrillo bag #2

To see the 26 Projects Lists, which list quilt WIPS, visit the March Current Projects update. Last month’s to Do List is a little longer.

 

Completed items since November 4, 2013 (prior to this month’s list)

  • Sew on sleeve for Original Bullseye
  • Kelly’s Brown Round Robin
  • Pillow from cake tea towel
  • Try plain square for center of Russian Rubix blocks
  • Hand sew bottom opening in Shopping bag for BAMQG
  • Finish binding on T-Shirt quilt
  • Secret Santa gift for BAMQG
  • Kathleen’s Round Robin
  • Make sleeve for Original Bullseye
  • Finish sewing triangles for Scrapitude
  • Take apart Ribbon Star and resew
  • Color Group donation quilt
  • Binding for Color Group donation quilt
  • Make shopping bag for BAMQG
  • Sew coffee patch to red bag
  • Sew coffee patch to bathrobe
  • Sew green and red striped 8 pointed star (probably should include an item called “find background template for 8 pointed star!)
  • Scrap Lab backpack
  • Make binding for Disappearing Pinwheel