March To Do List

I didn’t think I made progress, but I actually did!

To Do List:

  1. Quilt Christmas table runner
  2. Wash fabric AKA The Great Unwashed (I am still pressing and cutting the loads of fabric I did in December. I did do a couple of loads in February since I wanted to use the fabric) ;-)
  3. Make stiff bucket or box for TP in main bath
  4. Make stiff bucket or box for TP in second bath – I am thinking of making this triangular in shape
  5. Anna Maria Horner Multi-tasker tote (gift-due Holiday 2013- sigh. Missed 2015 deadline as well) – found the pattern, which is a good start.
  6. Make 3 notepad covers (gifts)
  7. Day in the Park backpack variation
  8. Sew Bon Appetit apron
  9. ATCs for CQFA January Meeting – meeting was cancelled and I have until February 28? I have found some fabric for the backs and marked it
  10. Make binding for Pink T Quilt
  11. Fix button on DH’s California shirt

To see the 26 Projects Lists, which list quilt WIPS, visit the December Current Projects update. Last month’s to Do List has a couple of changes, which is heartening.

All small items, prior to those completed in December 2014,  have been completed since November 4, 2013. This is a new list for 2015. You can find the list for 2014 and previous on the last post.

Finished in 2015:

  •  Make two bags for gifts
  • Dragon Box (gift)
  • Make back for Pink T Quilt