Carpenter’s Wheel – First Piece

Carpenter's Wheel - first piece
Carpenter’s Wheel – first piece

Hard on the heels of the Peacock was a deadline for the Carpenter’s Wheel. Since I had started thinking of the background for each block in terms of low volume prints, there was a lot of text fabric included.When the text Challenge was announced at my modern guild, I immediately thought of this piece. It wasn’t exactly made specifically for this challenge, but it fit the theme and the blocks were just hanging around, so Text challenge quilt it was.

That meant that I had to get some of it done before the big reveal, which was Saturday. I couldn’t be there due to #politicalwifery. Still, I had options for showing it.

I used some mini charms, which I bought in Oregon, to get the ball rolling, but picked up other text fabrics along the way as well. A few weeks ago, I spent some quality time with the Accuquilt and the 2.5 inch die cutting, what I hoped were, enough squares to make 3 background blocks.

Carpenter's Wheel - Feb 2017
Carpenter’s Wheel – Feb 2017

I refused to compromise my vision, which started with the layouts I worked on in the spring of last year. I wanted some good texture int he background, so multiple squares, rather than big squares of fabric it was to be. I began using the 2.5 inch squares as leaders and enders as I finished the back for The Peacock. I made a stack of 4 patches, which later turned into 3 background squares.

Carpenter's Wheel background block
Carpenter’s Wheel background block

I wanted to see how 4 inch squares would look mixed in. I chose the fabrics carefully and fussy cut in some cases. I thought they fit in and didn’t scream, so I used a couple in each block. This make the piecing go a little faster and add a little relief to the background.

I had to sew into the evening on Thursday in order to give it to my SIL on Friday to take to the meeting. I succeeded and still got to spend time with DH. I have gotten some very nice comments on Instagram and hope, even if unfinished, it is well received at guild.

Peacock Top Complete

Peacock top Complete
Peacock top Complete

I finally finished the Peacock top. The photo looks a little odd, because my design wall isn’t large enough for the whole top so it is bent around the corner and taped to the fabric closet door.  Still, done is done albeit large.

I also finished the back this past weekend. I knew it would take awhile so I started after I returned from the CQFA meeting and the BAM Sew Day. I spent about 4 hours and got about half of it done. The rest of it took me all day on Sunday. I thought about this and decided that the smaller the pieces I have to work with the more time the back takes. I had used most of the large-ish pieces on Saturday, so I was left with rather small pieces. I thought I would be annoyed, but I sewed, actually, quite happily on the back.

I needed to get it done before the CQFA Retreat, because someone wanted to buy my design wall. That didn’t work out so my Pind design wall is available for sale, if you are interested. It works great and is in great shape; it just isn’t large enough for me. Let me know if you are interested.

26 Projects – February 2017 Edition

I am clearing up my workroom a bit after taking down my large design wall and finding a plethora of odds and ends behind it. In the course of cleaning, I am assembling fabrics to donate, which count in the ‘used’ (e.g. no longer in the stash) column of my fabric spreadsheet.

Finished 2017 Quilt Projects

None yet

Finished 2017 Non-Quilt Projects

Doing Good

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • Carpenter’s Wheel blocks – I made a few more blocks and am ready to put the blocks together. This means making text/low volume blocks, which I want to do quickly so I can also get this piece to Colleen.
  • City Samplerblocks all made. Need to sash the blocks and finish putting the top together. I have the fabric I will use, but I think it needs to be washed.
  • English Paper Piecing Project– half hexies – I am still making stars. I am using the big stack of fabrics I cut over Thanksgiving to make more stars. This piece is a weird shape otherwise I would just finish it and move on. I do still have 4 months of traveling with DH.
  • En Provence – Working on the second clue, I think. I put it off while I finished The Peacock as the mind shift was making me a little crazy.
  • FOTY 2016 – time to start arranging it. I wanted to do it immediately after finishing the Peacock top, but with my design wall issues, I don’t think I will.
  • Lobster – have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for. Another leaders/enders project or do I want to lay out the blocks more carefully?
  • Peacock Quiltoff the design wall and the top is sewn together. Next step is to make the back. My deadline is Feb 6 as I want to take it to Colleen that week.
  • Under the Sea: class project; like the design and am happier with the colors. I bought a few spools of Sue Spargo’s embroidery thread and continue to embroider. I want to finish it soon, though the piece does keep calling for more embroidery.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

    1. Aqua-Red Sampler – The partial seaming tutorial was finished in September. Now I need to lay the blocks out and put the piece together.
    2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, I did bring it to the 2017 CQFA Retreat as a potential project. It is still in a prominent location so I have easy access.
    3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
    4. Pies and Points from Victoria Findlay Wolfe class. No further progress. I did wash the background fabric I found when I went to Portland, so I am ready to cut. I need to focus on this and it is not up high enough on the list yet.
    5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
    6. Serendipity Lady Quilt: no progress.
    7. Stepping Stones #2 – I am ready to make the border blocks , but haven’t done anything yet.

Ready for Quilting

  • Nothing

In Quilting Process

  • Thanksgiving tablemat – I started quilting this piece at the 2017 CQFA Retreat. I made good progress, but it isn’t finished yet.
  • Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while. It did come with me to Retreat and almost made it high enough on the list to get some love.

Binding

None

Hunting and Gathering

  • 30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew these yet, so whenever I have a chance I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too.
  • Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2inch squares
  • Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.

What’s on your list?

26 Projects – December 2016 Edition

I have been sewing fairly steadily for the past month or so. I am making progress, but don’t have any finishes – or any large finishes – to speak of. Somehow I feel like I am in a morass of projects and not able to move forward. It is as though I am sewing in place.

Finished 2016 Quilt Projects

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • Carpenter’s Wheel blocks – I still need to make a few blocks, though I did see a layout similar to the one I mentioned I liked in the new book I got from Sandy K from the BAMQG Winter Extravaganza Palooza Swap. The layout has the blocks laid out in a circle.
  • English Paper Piecing Project– half hexies – I am still making stars. I cut a big stack of fabrics for more stars over Thanksgiving.
  • Lobster – have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for. Another leaders/enders project or do I want to lay out the blocks more carefully?
  • Peacock Quilton the design wall and sewing the top together is in process.
  • Pies and Points from Victoria Findlay Wolfe class. No further progress. I did find more of the background fabric when I went to Portland, so I can make a larger piece.
  • Stepping Stones #2 – I am in the process of making the border blocks after I designed them to be a little different from the first Stepping Stones quilt.
  • Under the Sea: class project; like the design and am happier with the colors. I bought a few spools of Aurifil 12wt and have been embroidering motifs with it and Perl Cotton. It might become a lush pillow for someone.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

    1. Aqua-Red Sampler – I made progress on the partial seaming tutorial and need to sit down to finish it.
    2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I am taking a machine quilting workshop soon (shock, horror, I know) and the focus is on background motifs. Just what I need!
    3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
    4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
    5. Serendipity Lady Quilt: no progress, though I have been thinking about her.

Ready for Quilting

  • Thanksgiving tablemat

In Quilting Process

  • Theoretically, the Tarts Come to Tea is in the quilting process.

Binding

None

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2? squares
  • Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

What’s on your list?

The Peacock – a Bit of Progress

Peacock - early December 2016
Peacock – early December 2016

Push has really come to shove on this project. I have to decide how to arrange the solids in the upper right hand corner. I have some strips cut and some ideas percolating, but this is where my design and construction style can run into problems.

I think the blues I have on the right will have to move up and I will have to use one that is darker to blend the dark-medium green more to the blues higher up.

There is a very strong diagonal line made from the greens on the middle right. I may need to figure out a way to smudge it as it is quite prominent.

As you can see, on the left, I also made the dark small hexies. They are not placed in their final location, but they will be towards the bottom left when all is said and done. As I have said 500 times, I need a larger design wall. Although, I fear if I have a larger design wall, my quilts will become larger.

Design Wall Monday

Design Wall Week of November 21, 2016
Design Wall Week of November 21, 2016

I don’t regularly post my design wall, though I do occasionally. The last time was in July. I am posting it this week, because I was enamoured with the look of my design wall last week.

As I said, I pressed and cut up many pieces of fabric over the weekend. Partway through my flurry of cutting, I looked up at the design wall to place another FOTY square and saw very little space left. As you can see above, the 4″ FOTY squares have almost taken over the space.

Design Wall Week of November 21, 2016
Design Wall Week of November 21, 2016

This time I don’t have very may different projects on the way. Part of that is because the Lobster fell off. Part of that is that The Peacock is taking up almost all of the other design wall.

  • 1,3 – FOTY squares
  • 2 – Stepping Stones
  • 4 – Bonnie Hunter Essential Triangle Tool
  • 5 – City Sampler blocks

There is actually a lot happening in my workroom, but it all seems to be in process with nothing every getting finished. Soon, I hope.

 

I am linking up with the Patchwork Times.

26 Projects – November 2016 edition

The last time I reviewed my list was in July. I have made some progress, but not a lot. August was pretty much a desert for getting projects done and I was gone in September so no sewing then either. I was ready to rock in October and am making some progress.

Finished 2016 Quilt Projects

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • Carpenter’s Wheel blocks – I finished #9 and #10. I thought this finish concluded the blocks. However, after I laid them out, I realized that I didn’t have enough to do what I wanted. I need to make a few more. Perhaps as leaders and enders?
  • English Paper Piecing Project– half hexies – I added three more stars to the large piece over the weekend. I also measure the piece and figure out how much more I have to stitch to get it to a good size.
  • Lobster – have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for. Another leaders/enders project or do I want to lay out the blocks more carefully?
  • Peacock Quilton the design wall and sewing the top together is in process.
  • Pies and Points from Victoria Findlay Wolfe class. No further progress. I did find more of the background fabric when I went to Portland, so I can make a larger piece.
  • Stepping Stones #2 – I am in the process of making the border blocks after I designed them to be a little different from the first Stepping Stones quilt.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I made progress on the partial seaming tutorial and need to sit down to finish it.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I am taking a machine quilting workshop soon (shock, horror, I know) and the focus is on background motifs. Just what I need!
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
  5. Under the Sea: class project; like the design and am happier with the colors. I bought a few spools of Aurifil 12wt and have been embroidering with it and the Perl Cotton on it. It might become a lush pillow for someone.
  6. Serendipity Lady Quilt

Ready for Quilting

  • Thanksgiving tablemat

In Quilting Process

  • Theoretically, the Tarts Come to Tea is in the quilting process. I am taking a class next weekend that may give me some ideas and perhaps get me back on track with it.

Binding

None

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x 4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • Pink Gradation Quilt: cutting 2.5″x 4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

What’s on your list?

Design Wall Monday – mid-July

It has been almost a month since I did a Design Wall post. The wall seems like a storage facility for pieces and parts lately. I am putting patches, bits of fabric, parts of blocks and hunting / gathering pieces up to get them out of the way more than work on them. Space feels at a premium in my workroom right at the moment.

Design Wall mid-July
Design Wall mid-July
  1. Flying Geese. I am making some sets of them again. I don’t think I need anymore for the design I am contemplating, but I have a stack of squares already cut and so I might as well make them.

2. I am still collecting red donation blocks. The two set apart are the latest.

3. FOTY 2016 latest squares. You can see some of the Food Quilt #3 fabrics showing up.

4. Donation squares. I seem to have mislaid the box, so I have been putting them on the design wall until it turns up, which it will undoubtedly do. This is always why there are no new donation blocks. No fabric = no blocks.

5. Partial seam block for my Aqua-Red Sampler. Tutorial coming soon.

6. Turquoise donation block. I am thinking of making a bunch of these next for another donation top.

7. Stepping Stones block. This is my sample. Yesterday I made some progress in my head about making the parts for the rest of the blocks I intend to make.

8. Lobster Placemat. I still need to do some stitching.

9. Pieces and parts for a Stepping Stones block.

10. Start of another donation block. I really need to find that bin!

11. Four patch for a blue donation block.

What’s on your design wall?

 

 

I am linking up with Judy Laquidara at the Patchwork Times.

July 2016 26 Projects List

I haven’t reviewed this list since April! I suppose I have too much other content to report on.

Finished 2016 Quilt Projects

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I made progress on the partial seaming tutorial and need to sit down to finish it.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I was thinking about how this was veering in the direction of being one of my ‘masterpieces,’ but now that it has languished for so long it just looks old and dated. :(
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
  5. Under the Sea: class project; like the design, but not the colors. Still a possibility for abandonment. Just can’t seem to pull the trigger.
  6. Serendipity Lady Quilt

Ready for Quilting
Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  • 2 Thanksgiving tablerunners
  • Thanksgiving tablemat

In Quilting Process

Binding

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5?x 4.5? blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2? squares
  • Pink Gradation Quilt: cutting 2.5?x 4.5? pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. The problem is that I mislaid the rotary template. Sigh. I may be able to cut the greys on a Sizzix.

Other

 

 

What’s on your list?

Finished: Food Quilt #3 Top & Back

There was a Sew-in this past weekend (4th of July in the US) and I spent most of the time working on the finishing aspects of the Food Quilt #3. I finished the binding on Saturday and the back on Sunday. Even though I have other projects on which to work, this felt like a coup.

Food Quilt #3: Finished top
Food Quilt #3: Finished top

The piece is about 101″x 86″. Yes, it is huge, which means that I don’t have a full picture of the top or back. The YM was gone, it was cold outside and I don’t have a room large enough to lay out the back or top. The above photo is part of the top with a bit of the back peeking through.

Food Quilt #3: Finished back
Food Quilt #3: Finished back

Of course the back is larger. Again, I have shown you only part of it due to the size.

I am pleased that this is done and will see about getting this and FOTY 2015 to the quilter soon.

Food Quilt #3: Making Progress

Food Quilt #3: Center
Food Quilt #3: Center

I made a little progress on Food Quilt #3 over last weekend. The center is now done. My next step is to put a thin (not sure how thin) black border around the center and then attach the piano key border to the black border. I have to decide if I want to use a solid back or a white on black. If I use the latter, I want it to have a subtle white design on it.

You may have also noticed that I have broken the bounds of the design wall and the quilt is laying on the floor. Crazy, I know!

Design Wall Monday

I don’t do this type of post every week, but felt like giving you an update this week. I also wonder if you haven’t seen this same Stepping Stones strewn design wall a million times before. I think the last update was in October.

Design Wall 6/13/2016
Design Wall 6/13/2016
  1. Flying Geese: I haven’t made anymore or received any in awhile. I still have my design and lots of squares cut, so I need to get back to this.

2. Donation blocks. I am saving the red blocks to make a quilt top. I think I have enough, but I haven’t counted. You can see the stash at the bottom of my design wall under #3. I might also be saving the blue blocks to do the same. We’ll see.

3. Newest FOTY 2016 squares.

4. Stepping Stones blocks. I am stuck with these on the wall, because I have half a block done. I need more HSTs to finish it. I don’t want to put them away until I get around to it in case I forget what needs to be done. I also found a stash of Turquoise/Red Stepping Stones blocks, so I might have enough to make something.

5. Blue donation block in progress. I usually put the pieces and parts of blocks in progress near where I can reach them as I use them for leaders and enders.

6. My box of donation 2.5″ patches waiting to become blocks.

 

I am linking up with Judy Laquidara at the Patchwork Times

May 2016: 26 Projects List

In my last post on this topic, I was feeling as though I was on the verge of finishing several projects. I have two large quilt projects well in hand, but nothing else, really. I guess that means I am still on the verge or was mistaken or could have been experiencing a bout of wishful thinking.

Finished 2016 Quilt Projects

Cityscape/Red & Black Improv Quilt – I still have to put the sleeve on, but the binding is on, so it is ready to go.

Flower Sugar donation quilt (I feel odd putting this finish here as there is so much I didn’t do on this piece – still there isn’t anywhere else to put it)

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch.

  • Carpenter’s Wheel blocks – I finished all of them and am working on the layout.
  • English Paper Piecing Project– half hexies – I finished adding another big section. I am excited about the La Passcaglia EPP project, so I may finish this up as….something and then move on. We’ll see. I had thought about this as my NSGW project and I may need to see that through.
  • Food Quilt #3 – food patches are cut. I went to start sewing and realized I didn’t have the center squares cut, so I have started to cut those. I haven’t made much progress, though I have purchased a few and may get busy as this would be a good quilt on which to make progress during the sewing of the FOTY 2015 patches.
  • Lobster – have more stitching to do and then I need to quilt it.
  • Horizon Midi Bag – have to finish top stitching
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for
  • Peacock Quilt – all of the large blocks are finished and I am working on the smaller blocks!
  • Pies and Points from Victoria Findlay Wolfe class. No further piecing progress, but I did buy more background fabric.
  • Stepping Stones #2 – I worked on this for awhile. I used the project as leaders and enders while I was sewing FOTY 2015. I need to measure the blocks I have and figure out where to go from here.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO, to me, is a WIP. The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I still have to work on the partial seaming tutorial.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I was thinking about how this was veering in the direction of being one of my ‘masterpieces,’ but now that it has languished for so long it just looks old and dated. :(
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
  5. Under the Sea: class project; like the design, but not the colors. Still a possibility for abandonment. Just can’t seem to pull the trigger.
  6. City Sampler/ Tale of Two Cities blocks. No progress despite the small group at BAMQG.
  7. Serendipity Lady Quilt

Ready for Quilting
Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  • 2 Thanksgiving tablerunners

In Quilting Process

Nothing being quilted.

Binding

  • Flowerburst

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x 4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • Food Quilt #3: cutting blue fabrics
  • Pink Gradation Quilt: cutting 2.5″x 4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space in my schedule.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. The problem is that I mislaid the rotary template. Sigh. I may be able to cut the background greys on a Sizzix.

What’s on your list?

April 2016: 26 Projects

In my last post on this topic, I felt like all of my sewing work was heavy and unmovable. Fortunately, that feeling has passed. I have made some progress. I am also still thinking about working slower.

Finished 2016 Quilt Projects

Flower Sugar donation quilt (I feel odd putting this finish here as there is so much I didn’t do on this piece – still there isn’t anywhere else to put it)

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch.

  • Carpenter’s Wheel blocks – I finished #9 and #10. This concludes the blocks and I will start laying them out soon.
  • English Paper Piecing Project– half hexies – I am adding another big section, but I have done half and stopped. Slowly but surely wins the race
  • Food Quilt #3 – food patches are cut. I went to start sewing and realized I didn’t have the center squares cut, so I have started to cut those. I am going for darker blues. Not navy, but not turquoise either. Somewhere in between since I want the quilt to feel boyish.
  • Lobster – have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for
  • Peacock Quilt – made a lot of progress sewing pieces and parts
  • Pies and Points from Victoria Findlay Wolfe class. No further progress yet
  • Stepping Stones #2 – I haven’t worked on this in awhile, but I still have one block on the wall for inspiration. I actually thought about working on it as leaders and enders, but defaulted to donation squares. No progress.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I still have to work on the partial seaming tutorial.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I was thinking about how this was veering in the direction of being one of my ‘masterpieces,’ but now that it has languished for so long it just looks old and dated. :(
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
  5. Under the Sea: class project; like the design, but not the colors. Still a possibility for abandonment. Just can’t seem to pull the trigger.
  6. City Sampler/ Tale of Two Cities blocks
  7. Serendipity Lady Quilt

Ready for Quilting
Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  • 2 Thanksgiving tablerunners

In Quilting Process

  • Flowerburst – the quilter
  • Red & Black Improv quilt – at the quilter

Binding

  • I made the binding for one Thanksgiving tablerunner, so I am ready to handstitch it.

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5?x 4.5? blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2? squares
  • Food Quilt #3: cutting blue fabrics
  • Pink Gradation Quilt: cutting 2.5?x 4.5? pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space in my schedule.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. The problem is that I mislaid the rotary template. Sigh. I may be able to cut the greys on a Sizzix.

What’s on your list?

March 2016: 26 Projects

March?? March already? What happened to January and February? The last time I posted on this topic was back in December and that was a great post, because I had accomplished so much. So far this year, there is a lot of hunting and gathering going on, but not many completions. It is all about process, though, right?

Finished 2016 Quilt Projects

none so far

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively (or pretending) working. A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP.

  • Carpenter’s Wheel blocks – I finished #8 and started to sew #9
  • English Paper Piecing Project– half hexies – slowly but surely wins the race
  • Food Quilt #3 – pieces are cut. I need to start sewing
  • Lobster – have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for
  • Peacock Quilt – need to sew pieces and parts
  • Pies and Points from Victoria Findlay Wolfe class.
  • Stepping Stones #2 – I haven’t worked on this, but I still have one block on the wall for inspiration. I could work on it at any time.

Still WIPs
I still have WIPs. Who doesn’t, after all? The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I still have to work on the partial seaming tutorial.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I was thinking about how this was veering in the direction of being one of my ‘masterpieces,’ but now that it has languished for so long it just looks old and dated. :(
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have been feeling like I need to finish this piece as it should be a good reminder to keep in my office.
  5. Under the Sea: class project; like the design, but not the colors. Still a possibility for abandonment. Just can’t seem to pull the trigger.
  6. City Sampler/ Tale of Two Cities blocks
  7. Serendipity Lady Quilt

Ready for Quilting
Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  1. 2 Thanksgiving tablerunners
  2. Flowerburst

In Quilting Process

  • Christmas Tablerunner – nearly done

Binding

  • I have to make the binding for one Thanksgiving tablerunner and then bind it.

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x 4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • Food Quilt #3: cutting food prints
  • Pink Gradation Quilt: cutting 2.5″x 4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space in my schedule.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. The problem is that I mislaid the rotary template. Sigh. I may be able to cut the greys on a Sizzix.

What’s on your list?