26 Projects List – July 2017 Edition

Finished 2017 Quilt Projects

Still no finished projects quite yet. The Peacock binding is finished almost puts me back in the black in terms of fabric usage. I have to make the sleeve and that should take some yardage as well. My fabric used list is still really suffering from being away from my sewing machine, tempting new quilt shops and just generally fabulous fabrics.

Finished 2017 Non-Quilt Projects
While finished quilts are thin on the ground, as you know, I have been sewing and I have finished a number of small projects. I am working on quilts, but I plan to make more small projects this year.

Shockingly, the above along with donation blocks and tops is about 50 yards of fabric this year and I am not in the black in terms of usage.

Doing Good

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • City Samplerblocks all made. Need to sash the blocks and finish putting the top together. Due to some issues I had with my seam allowance, some of the blocks are smaller than others, so I will have to adjust them in some way – either adding a piece or two to the block or with sashing. I have the sashing fabric and it is washed, so the only thing stopping me from getting going is time and other projects.
  • Dots & Stripes HST Quilt (or Something) – half square triangle blocks are made. I have to lay them out and see what is what with them.
  • English Paper Piecing Project– half hexies – I am still making stars. I am still using the big stack of fabrics I cut over Thanksgiving to make them. This piece is a weird shape otherwise I would just finish it and move on.
  • En Provence – I finished the the third clue and plan to cut more Peaky and spikes at Craft Night for the next clue.
  • FOTY 2016 – I knew it was time to start arranging it and didn’t realize I was stalled until I saw Ellsworth Kelly’s Spectrum Colors Arranged by Chance, 1951-53. Now I am excited again about it, so it is closer to the top of the list. 6 months into the year and I need to get on it.
  • Lobster – I still have more stitching to do and then I need to quilt it.
  • Triple Star: I am cutting out the pieces in between  other projects.
  • Under the Sea: class project; like the design and am happier with the colors. I worked on it a little at Craft Night recently.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

    1. Aqua-Red Sampler – I need to lay the blocks out and put the piece together.
    2. BAMaQG IRR – this was never on the list before, but I have clearly been working on it for a long time. I think the last time I even really thought about it was in June of 2016 when Ruth returned it to me. The last post has some good ideas about what I need to do next.
    3. Octagon 9 Patch: It is ready to put together. I could have used it as leaders and enders for a number of different projects I have going, but I didn’t. Not sure what I am waiting for. Do I want to lay out the blocks more carefully? I actually have a plan for it, so I should get on it. I should do a lot of things.
    4. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, I did bring it to the 2017 CQFA Retreat as a potential project. It is still in a prominent location so I have easy access. I just signed up for the BAMaQG retreat, so perhaps that will be the time.
    5. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
    6. Pies and Points from Victoria Findlay Wolfe class. No further progress. I did wash the background fabric I found when I went to Portland, so I am ready to cut. I need to focus on this and it is not up high enough on the list yet.
    7. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. As mentioned my career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
    8. Serendipity Lady Quilt: no progress.
    9. Stepping Stones #2 – I am ready to make the border blocks , but haven’t gone beyond designing the blocks yet.
    10. Lozenge quilt – need to trim blocks.

Ready for Quilting

  • Carpenter’s Wheel – I took this to Colleen’s last week and am waiting for her to get back to me. I am hoping it will take less time than the Peacock.

In Quilting Process

  • Thanksgiving tablemat – I started quilting this piece at the 2017 CQFA Retreat. I made good progress, but it isn’t finished yet. Another BAMaQG retreat project?
  • Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while. It did come with me to Retreat and almost made it high enough on the list to get some love.

Binding

Peacock Quilt – finished quilting; have to pick up from my quilter, so I can bind.

Hunting and Gathering

  • 30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew these yet, so whenever I have a chance I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too.
  • Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2 inch squares. I used a lot of these squares for En Provence, so I will need to cut more.
  • Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.

What’s on your list?