I had 14 items on my February To Do List. I have removed four that I completed prior to that post and have crossed off the ones I completed since January 4. I also added at least 3 new ones, so it doesn’t look like I made much progress.
This list is in no particular order.
To Do List:
- Sew green and red striped 8 pointed star (probably should include an item called “find background template for 8 pointed star!)
- Sew white on black wavy line 8 pointed star
- Layer, baste Christmas table runner
- Quilt Christmas table runner
- Quilt/stitch fish postcard
- Wash fabric (I am guessing this will never be off the list) – I did wash a bunch of fabric. It made some difference. I still have a lot to do.
- Make stiff bucket or box for TP in main bath
- Make stiff bucket or box for TP in second bath
- Dragon Box (gift)
- Anna Maria Horner Multi-tasker tote (gift-due Holiday 2013- oops)
- Make 3 notepad covers (gifts)
Sew coffee patch to red bagSew coffee patch to bathrobe- Scrap Lab backpack
- Day in the Park backpack variation
- Petrillo bag #2
To see the 26 Projects Lists, which list quilt WIPS, visit the February update
Completed items since November 4, 2013 (prior to this month’s list)
- Sew on sleeve for Original Bullseye
- Kelly’s Brown Round Robin
- Pillow from cake tea towel
- Try plain square for center of Russian Rubix blocks
- Hand sew bottom opening in Shopping bag for BAMQG
- Finish binding on T-Shirt quiltSecret Santa gift for BAMQG
- Kathleen’s Round Robin
- Make sleeve for Original Bullseye
- Finish sewing triangles for Scrapitude
- Take apart Ribbon Star and resew
- Color Group donation quilt
- Binding for Color Group donation quilt
- Make shopping bag for BAMQG